Journal: :IJORIS 2012
Deniz Mungan Junfang Yu Bhaba R. Sarker Mohammad Anwar Ashek Rahman

A Pareto-optimal solution is developed in this paper for a scheduling problem on a single machine with periodic maintenance and non-preemptive jobs. Most of the scheduling problems address only one objective function, while in the real world, such problems are always associated with more than one objective. In this paper, both multi-objective functions and multi-maintenance periods are consider...

2010
Jeremy Erickson Nan Guan Sanjoy K. Baruah

The Earliest Deadline First (EDF) scheduling algorithm is known to be suboptimal for meeting all deadlines under global scheduling on multiprocessor platforms. However, EDF is an attractive choice for scheduling soft-real-time systems on multiprocessors. Previous work has demonstrated that the maximum tardiness is bounded, and has derived formulas for computing tardiness bounds, in EDF-schedule...

Journal: :Computers & Industrial Engineering 2005
S. Thiagarajan Chandrasekharan Rajendran

In many manufacturing systems, jobs that are completed early are held as finished-goods inventory until their due-dates, and hence we incur earliness costs. Similarly, jobs that are completed after their due-dates incur penalty. The objective in such situations would, therefore, be to meet the due-dates of the respective jobs as closely as possible, and consequently minimize the sum of earlines...

2014
Rui Zhang Cheng Wu Furong Gao

The job shop scheduling problem JSSP is a notoriously difficult problem in combinatorial optimization. In terms of the objective function, most existing research has been focused on the makespan criterion. However, in contemporary manufacturing systems, due-date-related performances are more important because they are essential for maintaining a high service reputation. Therefore, in this study...

Journal: :journal of optimization in industrial engineering 2012
esmaeil najafi bahman naderi hassan sadeghi mehdi yazdani

this paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. first, the problem is formulated as a mixed integer linear programming model. then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. two experiments are carried out to evaluate th...

Journal: :Computers & Industrial Engineering 2015
Hui Zhu Min Li Zhangjin Zhou

In this paper we investigate scheduling problems with a deteriorating and resource-dependent maintenance activity on a single machine. The duration of the maintenance is assumed to be dependent both on its starting time and on the resource allocated to it. The objective is determining the job sequence, the position to perform a maintenance activity and the amount of additional resource allocate...

2001
E. KUTANOGLU I. SABUNCUOGLU

Meeting due dates as a re ̄ ection of customer satisfaction is one of the scheduling criteria that is frequently encountered in today’s manufacturing environments. The natural quanti ® cation of this qualitative goal involves tardiness related measures. In this study, we consider the dynamic job shop scheduling problem with the weighted tardiness criterion. After we present a comprehensive liter...

2012
Sedighe Arabameri

In this researcha particle swarm optimization (PSO) algorithm is proposedfor no-wait flowshopsequence dependent setuptime scheduling problem with weighted earliness-tardiness penalties as the criterion ( | , | ∑ " ).The smallestposition value (SPV) rule is applied to convert the continuous value of position vector of particles in PSO to job permutations.A timing algorithm is generated to find t...

Journal: :Mathematical Social Sciences 2011
Evgeny R. Gafarov Alexander A. Lazarev Frank Werner

We consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity results. Particu...

1997
Shyh-Chang Lin Erik D. Goodman William F. Punch

This paper describes a genetic algorithm approach to the dynamic job shop scheduling problem with jobs arriving continually. Both deterministic and stochastic models of the dynamic problem were investigated. The objective functions examined were weighted flow time, maximum tardiness, weighted tardiness, weighted lateness, weighted number of tardy jobs, and weighted earliness plus weighted tardi...