Received: December 14, 2010 Accepted: January 21, 2011 doi:10.5539/jmr.v3n2p235 Abstract In this study, successive sampling for regression estimation was used to determine the current estimate of the mean, minimum variance, maximum precision, estimate of change between the two successive occasions under consideration and estimate of average over the period of the two occasions. The data used we...