نتایج جستجو برای: construction site layout planning
تعداد نتایج: 763479 فیلتر نتایج به سال:
Knowledge of the status of site spaces is critical to generating effective and reliable site layout plans. Previous approaches to site layout planning advocate generating layouts based on the planned project schedule which do not reflect the actual status of the project in terms of activities, resources and associated spaces. As such, this questions the reliability of the generated site layouts...
A local municipality has decided to build a sewage pit to receive residential sewage waste arriving by tank trucks. Daily accumulated waste are to be pumped to a nearby waste water treatment facility to be re-consumed for agricultural and construction projects. A discrete-event simulation model using Arena Software was constructed to assist in defining the capacity of the system in cubic meters...
Research on fuel cell hydrogen refueling stations is mostly concentrated newly-built stations, and there are few studies the combined CNG stations. The construction plan of conducive to planning layout, solving difficulties in land use reducing investment operating costs. This paper analyzes feasibility station construction, scale station, proposes its general layout plan.
The area of dynamic planning construction sites is unexplored. Although there a large amount scientific interest in the literature site layouts, with different methodologies developed, studies on relocation do not exist. purpose this study to cover gap and contribute body knowledge by presenting for first time its importance linear projects validate methodology through real case studies. decisi...
Electric vehicle charging stations are essential infrastructure in developing electric vehicles. In order to construct reasonable amount of electric vehicle charging stations with proper locations, a mathematical multi-level layout planning model, which aims at minimizing the initial construction investment and the users’ charging cost simultaneously, is employed in this paper. An improved gene...
The Jombang TPA Development Project is a project owned by the Ministry of PUPR, carried out PT. Adhi Karya (Persero), Tbk. with landfill capacity 5 hectares, not only that built supporting buildings such as leachate water installations, management and employee buildings. In 2020 there was an outbreak Covid-19 which resulted in setback implementation construction projects. planning alternative r...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید