نتایج جستجو برای: generalized flow shop

تعداد نتایج: 651846  

2002
Kambiz Farahmand Arun Balasubramanian

A discrete event simulation model was developed to study the flow of material and product in a shop floor. It uses real time data available from a job shop sole dedicated to noncommercial contracts and as such deals with very seasonal demand. The objective of this model is to provide the shop with a decision support tool that will assist in evaluating the movement of products throughout the sho...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه تربیت مدرس 1378

مسئله تعیین توالی مجموعه ای از کارها با معیار کمینه سازی مجموع بیشینه های زودکرد و دیرکرد مورد بررسی قرار گرفته است . این معیار به دلیل سعی در حداقل کردن و به صفر رساندن مقادیر زودکرد و دیر کردار، منطبق بر سیستمهای تولیدی مختلفی از جمله jit می باشد. این معیار در مسائل یک ماشین و n کار (n/1/et max) و مسائل m ماشین و n کار با حالت flow shop، (n/m/p/et max) مورد بررسی قرار گرفته است . حالتهای خاص ...

2008
P. R. Kleindorfer

This research presents a formal model of the one machine job shop scheduling problem with variable machine and labor capacity. Primary interest is focused on the trade-off between overtime and detailed scheduling costs. The detailed scheduling problem considered is minimizing the sum of weighted tardiness and weighted flow-time costs for a given capacity plan (e.g., a given overtime schedule). ...

2014
Jihong Yan Jing Wen Lin Li

Based on MATLAB/SimEvents simulation platform and genetic algorithm, the simulation and optimization of energy consumption in hybrid flow shop is studied. Considering workshop layout and workpiece path, machining process simulation in hybrid flow shop is realized. With the processing time, processing power and stand-by power introduced into simulation model, the energy consumption simulation in...

Journal: :CoRR 2017
Jean-Charles Billaut Federico Della Croce Fabio Salassa Vincent T'Kindt

In shop scheduling, several applications exist where it is required that some components perform consecutively. We refer to no-idle schedules if machines are required to operate with no inserted idle time and no-wait schedules if tasks cannot wait between the end of an operation and the start of the following one. We consider here no-idle/no-wait shop scheduling problems with makespan as perfor...

This paper proposes an effective multi-objective differential evolution algorithm (MDES) to solve a permutation flow shop scheduling problem (PFSSP) with modified Dejong's learning effect. The proposed algorithm combines the basic differential evolution (DE) with local search and borrows the selection operator from NSGA-II to improve the general performance.  First the problem is encoded with a...

2015
Jitti Jungwattanakit Manop Reodecha Paveena Chaovalitwongse Frank Werner

This paper presents an investigation of scheduling procedures to seek the minimum of a positively weighted convex sum of makespan and the number of tardy jobs in a static flexible flow shop scheduling environment. The flexible flow shop problem is a scheduling of jobs in a flow shop environment consisting of series of production stages, some of which may have only one machine, but at least one ...

2010
Mário A. G. Melo Manuel J. Pereira

In this paper, we address the problem of finding a permutation schedule of n jobs in an m machine flow-shop environment that minimizes the maximum completion time Cmax (Makespan) of all jobs. The jobs are available at time zero and have sequence-dependent setup times on each machine. All parameters, such as processing and setup times, are assumed to be known with certainty. This problem is clas...

Journal: :European Journal of Operational Research 2006
Saral Mukherjee Ashis Kumar Chatterjee

The Shifting Bottleneck (SB) heuristic is among the most successful approximation methods for solving the Job Shop problem. It is essentially a machine based decomposition procedure where a series of One Machine Sequencing Problems (OMSPs) are solved. However, such a procedure has been reported to be highly ineffective for the Flow Shop problems (Jain and Meeran 2002). In particular, we show th...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید