نتایج جستجو برای: sequence dependent setup time

تعداد نتایج: 2781686  

Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
y. maboudian s. ebrahimnejad r. tavakkoli-moghaddam s. , hatami

in this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. this problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. in this mode...

2014
Qi Cheng Jiabao Zhang Yanxia Guo

This study investigates the single-machine scheduling problem with common due-win -dow assignment, past-sequence-dependent (p-s-d) setup times and a deteriorating maintenance activity. By past-sequence-dependent setup times, we mean that the setup time of a job is proportional to the sum of the processing times of the jobs already processed. The objective is to minimize a cost function based on...

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

Journal: :Complex & Intelligent Systems 2022

Abstract This paper addresses a multi-objective energy-efficient scheduling problem of the distributed permutation flowshop with sequence-dependent setup time and no-wait constraints (EEDNWFSP), which have important practical applications. Two objectives minimization both makespan total energy consumption (TEC) are considered simultaneously. To address this problem, new mixed-integer linear pro...

Hamid Davoudpour Hamidreza Kia Seyed Hassan Ghodsypour

In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...

Journal: :international journal of industrial engineering and productional research- 0
m. heydar b. karimi s.a torabi

the problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. in this paper we present a new mixed integer non linear program (minlp) and a heuristic meth...