نتایج جستجو برای: weighted resource tardiness
تعداد نتایج: 311669 فیلتر نتایج به سال:
The General Scheduling Problem (GSP) generalizes scheduling problems with sum of cost objectives such as weighted flow time and weighted tardiness. Given a set of jobs with processing times, release dates, and job dependent cost functions, we seek to find a minimum cost preemptive schedule on a single machine. The best known algorithm for this problem and also for weighted flow time/tardiness i...
This paper considers sequencing situations with due date criteria. Three di erent types of criteria are considered: the weighted penalty criterion, the weighted tardiness criterion and the completion time criterion. The main focus is on convexity of the associated cooperative games.
This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...
Many optimization problems in the industrial engineering world, particularly in manufacturing systems, are very complex in nature and difficult to solve by conventional optimization techniques. The use of formal approaches is frequently limited owing to the complexity of the models or algorithms. In this paper, a novel approach is proposed for large scale single machine weighted tardiness probl...
The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased interest in energy management algorithms. In this talk we will present several new constant factor approximation algorithms for energy aware scheduling probl...
We introduce a multimode resource-constrained project scheduling problem with finish-to-start precedence relations among project activities, considering renewable and nonrenewable resource costs. We assume that renewable resources are rented and are not available in all periods of time of the project. In other words, there is a mandated ready date as well as a due date for each renewable resour...
This paper proposes an application of probabilistic technique, namely Gaussian process regression, for estimating an optimal sequence of the single machine with total weighted tardiness (SMTWT) scheduling problem. In this work, the Gaussian process regression (GPR) model is utilized to predict an optimal sequence of the SMTWT problem, and its solution is improved by using an iterated local sear...
The single machine total weighted tardiness problem (SMTWTP) is a well-known planning problem from operations research, engineering and computer science. It is characterized by the assignment of starting times for a given set of jobs on a single processor, minimizing the (weighted) tardy completion of the jobs with respect to given due dates. In this sense, the tardiness is given an economical ...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید