نتایج جستجو برای: earned value management

تعداد نتایج: 1529930  

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

Journal: :Journal of the Korea Society of Systems Engineering 2015

Journal: :Jurnal Mitra Teknik Sipil 2023

A construction project is a series of activities carried out to construct building within specified period. Delay in projects problem that often occurs so these constraints make the implementation time not as specified. The success management based on proper control. This research real data from one hospital Bandung. purpose this study estimate completion using Earned Value and Schedule methods...

Journal: :مهندسی صنایع 0
ایمان ربیعی عضو هیئت علمی گروه مهندسی صنایع - دانشگاه پیام نور شیراز ایرج مهدوی دانشیار گروه مهندسی صنایع- دانشگاه علوم و فنون مازندران مرتضی باقرپور استادیار دانشکده مهندسی صنایع - دانشگاه علم و صنعت ایران رضا توکلی مقدم استاد گروه مهندسی صنایع- پردیس دانشکده های فنی- دانشگاه تهران

earned value management (evm) is the process of integrating the time and cost management within the framework of project scope management. the earned value has provided methods for predicting the cost for projects. in large part, these methods have not been improved upon since their beginnings and remain unsubstantiated as to accuracy. in this direction, several mathematics formulas have been d...

2000
Northrop Grumman

T his article discusses a set of integrated , performance measurement techniques that increased Northrop Grumman Corporation's software success. These techniques can enable excellent project management in the following ways: • Defining effective metrics for sizing the project and measuring progress. • Using Earned Value Management (EVM) as the key, integrating tool for control. • Defining quali...

2009
Fredrick W. Taylor Henry L. Gantt Seyed Hossein Iranmanesh

This paper presents an application of Artificial Neural Network (ANN) to forecast actual cost of a project based on the earned value management system (EVMS). For this purpose, some projects randomly selected based on the standard data set , and it is produced necessary progress data such as actual cost ,actual percent complete , baseline cost and percent complete for five periods of project. T...

Journal: :Simula SpringerBriefs on computing 2021

Open Access Simula SpringerBriefs on benefits management, benefit points, earned business value benefit/costs index, uncertainty assessment.

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید