نتایج جستجو برای: hybrid flow shop scheduling

تعداد نتایج: 731552  

G. Moslehi and M. Mahnam,

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

Journal: :Expert Syst. Appl. 2015
Andrea Rossi Sauro Soldani Michele Lanzetta

The proposed hybrid stage shop scheduling (HSSS) model, inspired from a real case in the high-fashion industry, aims to fully exploit the potential of parallel resources, splitting and overlapping concurrent operations among teams of multifunctional machines and operators on the same job. The HSSS formally extends mixed shop scheduling (a combination of flowshop and open shop), which is able to...

G. Moslehi and M. Mahnam,

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

Journal: :Chinese journal of mechanical engineering 2022

Abstract The connection between production scheduling and transportation is getting closer in smart manufacturing system, both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated problem (IPTSP) hybrid flow shops, which an extension shop (HFSP). In addition to on machines, process automated guide...

Journal: :Business & Management Studies: An International Journal 2019

2005
ANTÓNIO FERROLHO

In this paper, scheduling problems in Flexible Manufacturing Cells (FMC) are studied. The scheduling objective is to minimize the makespan. We used a genetic algorithm (GA) for solving the optimization scheduling problem. We have developed one FMC with industrial characteristics with the objective of studying scheduling problems in these types of manufacturing systems (single machine scheduling...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید