نتایج جستجو برای: pit mine production scheduling

تعداد نتایج: 697924  

Slope stability is one of the most important issues in open pit mining design. The main purpose of any open pit mine design is to propose an optimal excavation configuration, considering safety, ore recovery and financial return. An accurate pit slope design which accounts for the mine geology, structural geology, rock mass properties, and hydrogeology models of the mine area, drastically enhan...

2011
Henry Amankwah

Amankwah, H. (2011). Mathematical Optimization Models and Methods for Open-Pit Mining. Doctoral dissertation. ISBN 978-91-7393-073-4. ISSN 0345-7524. Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained in them, and in this process a deeper and deeper pit is formed until the mining operation ends. Mining is often a highly complex industrial operat...

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...

Journal: :Mining of Mineral Deposits 2021

Purpose is to develop efficient scheduling excavate steep-grade iron-ore deposits using near-vertical layers relying upon production practices by an open pit of Poltava Mining-and-Processing Integrated Works (MPIW). Methods. The goal achievement involved system analysis openwork for means in MPIW; the process was structured from viewpoint decision-making under uncertainty. Findings. New methods...

Journal: :int. journal of mining & geo-engineering 2012
a. khodayari a. jafarnejad

in the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. different goals may be used for determining optimum cut-off grade. one of...

Journal: :iranian journal of fuzzy systems 2014
iraj alavi

all steps of a mining project generally disturb the environment'soriginal condition during construction. therefore, it is crucial toimplement an appropriate mine reclamation plan throughout all mineplanning stages from sustainable and environmental point of view.planting the suitable plant species in each step of any reclamationplan and each area is one of the necessities in this respect.select...

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

2008
Heather F Chapman Stuart L Simpson

A combination of toxicity testing using the freshwater shrimp Caradina indistincta and modelling of metal speciation has been used to assess water quality requirements for mine pit water releases from the Mt Morgan gold and copper mine site in Central Queensland to the Dee River. Analysis of the mine pit water indicated concentrations of some metals (730 mg/L Al, 35 mg/L Cu, 25 mg/L Zn) were se...

Journal: :Optimization Letters 2011
Christopher Cullenbine R. Kevin Wood Alexandra M. Newman

The open pit mine block sequencing problem (OPBS) seeks a discrete-time production schedule that maximizes the net present value of the orebody extracted from an open-pit mine. This integer program (IP) discretizes the mine’s volume into blocks, imposes precedence constraints between blocks, and limits resource consumption in each time period. We develop a “sliding time window heuristic” to sol...

2016
Y. A. Sari M. Kumral

represented by a block model that divides the orebody into a three-dimensional array of blocks. Each block consists of a cluster of similar characteristics such as rock type and ore grade, and has attributes such as tonnage of ore contained within the block and an expected economic value (Bley et al., 2010). For each block, the mine production scheduling problem consists of the decisions of (1)...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید