نتایج جستجو برای: stochastic lead times

تعداد نتایج: 781472  

Journal: :Mathematical Problems in Engineering 2014

Journal: :The Annals of Applied Probability 1993

Journal: :IEEE Transactions on Automatic Control 1990

2017
Heydari M.

In this paper, the stochastic location-routing-inventory problem is considered in which retailers’ demands and lead-times are stochastic. Demand quantities follow Poisson distribution and lead-times are functions of the shortage quantity. It is also assumed that both retailers and distributors hold inventory and follow (S-1, S) inventory policy. According to these assumptions, we use METRIC (i....

Journal: :journal of optimization in industrial engineering 2010
jafar razmi reza tavakoli moghaddam mohammad saffari

this paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. in the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). however,, two significant criteria for each schedule in stochastic models are: expectable m...

This paper presents a multi-objective simulated annealing algorithm for the mixed-model assembly line balancing with stochastic processing times. Since, the stochastic task times may have effects on the bottlenecks of a system, maximizing the weighted line efficiency (equivalent to the minimizing the number of station), minimizing the weighted smoothness index and maximizing the system reliabil...

In this paper, a newsboy model is developed under uniformly distributed lead-time and demand that is an appropriate assumption in obtaining optimal relief inventory of humanitarian disasters. It is noteworthy that limited historical data are in hand on relief operations. Hence, analytical and approximate solutions for optimal relief order quan­tity were derived. The effect of lead-time uncertai...

2005
DONGPING SONG C. HICKS C. F. EARL

This paper considers a stochastic assembly system operating on a make-to-order basis with complex product structure and resource constraints. The problem is to ® nd the optimal planned job release times by minimizing the expected sum of the work-in-progress holding cost, product earliness cost and product tardiness cost. A perturbation analysis algorithm is developed to derive the gradient esti...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید