نتایج جستجو برای: total weighted earliness

تعداد نتایج: 891369  

Journal: :Expert Systems With Applications 2022

This paper investigates an unrelated parallel machine scheduling problem with a restrictive common due date. The objective is to minimize the total sum of earliness/tardiness costs. Using some properties such as V-Shaped property, optimizing start times machines, and no idle time between successive jobs, we propose effective construction-based heuristics local search algorithms for problem. var...

2007
Tamer Eren

In this paper a multicriteria scheduling problem with sequence-dependent setup times on a single machine is considered. The objective function of the problem is minimization of the weighted sum of total completion time, maximum tardiness and maximum earliness. An integer programming model is developed for the problem which belongs to NP-hard class. Only small size problems with up to 12 jobs ca...

2014
S. Molla-Alizadeh-Zavardehi R. Tavakkoli-Moghaddam

In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversif...

Journal: :INFORMS Journal on Computing 2015
Halil Sen Kerem Bülbül

Abstract: Research on due date oriented objectives in the parallel machine environment is at best scarce compared to objectives such as minimizing the makespan or the completion time related performance measures. Moreover, almost all existing work in this area is focused on the identical parallel machine environment. In this study, we leverage on our previous work on the single machine total we...

Journal: :Transactions of the Institute of Systems, Control and Information Engineers 1995

Journal: :Journal of Industrial and Management Optimization 2022

<p style='text-indent:20px;'>In this research, a parallel machine sequence-dependent group scheduling problem with the goal of minimizing total weighted earliness and tardiness is investigated. First, mathematical model developed for research which can be used solving small-sized instances. Since shown to NP-hard, focuses on proposing meta-heuristic algorithms finding near-optimal solutio...

2012
Cheng-Hsiang Liu

Abstract—In most classical scheduling models, a job is assumed to deliver to a customer at the instant of a job processing completion. In numerous practical situations, however, multiple delivery dates exist, where the time interval between any two consecutive delivery dates is constant. This type of fixed delivery strategy results in substantial cost savings for transportation and handling. Th...

2006
Yann Hendel Francis Sourd

We use the Akers-Friedman geometric approach to solve the two jobs job-shop problem when there is an earliness cost on the first operation and a tardiness cost on the last operation of each job. We then generalize the problem by imposing earliness and tardiness costs on each operation and finally, we solve it using a dynamic programming algorithm. KeywordsEarliness-tardiness scheduling, Polyn...

Journal: :Journal of Industrial and Management Optimization 2021

This paper considers single machine due-window assignment scheduling problems with position-dependent weights. Under the learning and deterioration effects of jobs processing times, our goal is to minimize weighted sum earliness-tardiness, starting time due-window, size, where weights only depends on their position in a sequence (i.e., weights). common (CONW), slack (SLKW) different (DIFW) assi...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید