نتایج جستجو برای: blast furnace slag

تعداد نتایج: 33949  

A. Shafyei Samad Ghasemi,

Using wastes as starting raw materials is a common method to reduce the production costs and the environmental pollution problems arising from such wastes. In this study the production and crystallization behavior of an iron rich glass prepared by iron and steel making wastes has been investigated. The raw materials used, were the blast furnace slag, the blast furnace dust, converter slag and s...

Journal: :Materiali in Tehnologije 2022

Blast-furnace slag is one of the main by-products produced in process blast-furnace ironmaking. Its metallurgical properties have an important impact on smooth operation and long life blast furnaces. In this paper, activity MgO a CaO-SiO2-MgO-Al2O3 quaternary system was measured using reference-slag method at 1773–1873 K. The effects temperature coefficient Mg Sn were discussed. results showed ...

Journal: : 2021

The problem of the accumulation waste from metallurgical industry in Ukraine, particular, blast furnace slag, has an economic and environmental component. Therefore, main problems, first all, include absence a criterion for greening industrial sector among priorities Ukraine's policy. article examines situation slag summarizes existing experience using slags as technogenic raw materials. proble...

Journal: :Advances in Materials Science and Engineering 2018

Journal: :Minerals 2023

In order to investigate the influence of SiC on composition and structure mixed slag (blast-furnace slag: steel = 1:9), chemical composition, equilibrium-phase microscopic morphological characteristics elemental distribution in region SiC-reagent-tempered samples were analyzed by X-ray diffractometer (XRD), FactSage7.1 thermodynamic analysis software, scanning electron microscope, energy spectr...

2015

Abstract—In this study, the Compressive strength of concretes made with Ground Granulated Blast furnace Slag (GGBS), Pulverised Fuel Ash (PFA), Rice Husk Ash (RHA) and Waste Glass Powder (WGP) after they were exposed 780C (exposure duration of around 60 minutes) and then allowed to cool down gradually in the furnace for about 280 minutes at water binder ratio of 0.50 was investigated. GGBS, PFA...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید