نتایج جستجو برای: concrete dam

تعداد نتایج: 88416  

2007
L. M. Zhang Y. Xu

A dam may fail when the loading (overtopping flood, flow through or beneath the dam, earthquake or blasting loading, terrorist attacks, deterioration etc.) exceeds the resistance against overtopping, internal erosion, slope instability, sliding/overturning, excessive deformation etc. To properly describe the causes of dam failures, it is necessary to study characteristics of the dams which have...

Journal: :Journal of Applied Engineering Sciences 2023

Abstract The stability evaluation of the dams subjected to seismic excitations is really very complex as earthquake response concrete gravity dam depends upon its connection joints with foundation rock. This study presents considering welded contact and friction along dam-foundation rock interface. Friction provided using elements. Two-dimensional finite element model Oued Fodda dam, located in...

H. Mirzabozorg, M.A. Hariri Ardebili, R. Kianoush,

In the present paper, nonlinear behavior of mass concrete simulated by smeared crack model is combined with Endurance Time Analysis (ETA) method for studying seismic response of arch dams. ETA is a time-history based dynamic pushover procedure in which special predesigned intensifying acceleration functions are used for analysis and estimation of structural responses in various performance leve...

Abdolhossein Azadmaneshb Seyed Majdeddin Mir Mohammad Hosseini

In the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. In this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. The concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...

Journal: :IOP Conference Series: Earth and Environmental Science 2018

Journal: :Proceedings of the Institution of Civil Engineers 1957

2012
Frank HERING Roger SCHLEGEL Gerd LEYENDECKER

SUMMARY No RCC dams have been built in Germany to date. HRB Waldbärenburg could be the first one. This project is part of the national flood control programme of the Federal State of Saxony in Germany and will go into the approval procedure at the end of 2012. The RCC dam technology has been chosen as it provides environmental advantages against other design alternatives: essential lower impact...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه یزد 1387

چکیده ندارد.

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید