نتایج جستجو برای: Cut-off-Wall

تعداد نتایج: 400115  

Journal: :international journal of civil engineering 0
m. naderi

having observed the costly failures of different cutoff walls, that had been constructed according to the mix design specified by reputable consultants in iran, a research programme was conducted to study the effects of constituent materials on the properties of plastic concrete. the main properties, such as compressive strength, biaxial and triaxial strains, permeability, and modulus of elasti...

Journal: :journal of the structural engineering and geotechnics 0
seyed majdeddin mir mohammad hosseini prof. amirkabir univ. of technology, tehran- iran abdolhossein azadmaneshb b. sc. civil eng. mahab ghodss consulting eng. co., tehran- iran

in the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. in this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. the concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...

Sarroud Dam is located in the north of Khorasan Razavi Province in the city of Kalat. Being located in a fault zone, it is necessary to inject the cut-off wall. Using remote sensing techniques, geographic information system, Landsat satellite imagery and field observations in this research, it was specified that the dam has been located within the range of the Sarroud Fault. According to this, ...

H. Ghasemzadeh, Z. Jamshidzadeh,

Abstract:   A two-dimensional fully implicit finite difference model, which can be easily extended to three dimensions, is developed to study the effect of cut-off walls on saltwater intrusion into the aquifers. This model consists of a coupled system of two nonlinear partial differential equations which describe unsteady density-driven groundwater flow and solute transport. The numerica...

Journal: :journal of structural engineering and geo-techniques 2015
seyed majdeddin mir mohammad hosseini abdolhossein azadmaneshb

in the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. in this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. the concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه شهید بهشتی - دانشکده علوم 1387

چکیده ندارد.

A. Zakaria, M.N. Salihin Yusoff,

Background: We investigated whether the lungheart ratio parameter (LHR) can be used to identify the optimum cut off frequency for Butterworth filter in 99mTc myocardial SPECT imaging. Materials and Methods: This study involved a cardiac phantom system consisting of cardiac insert in which 1.10 cm cold defect was inserted into its myocardium wall and filled with 4.0 μCi/ml (0.148 MBq/ml...

Design of earth dams and their problems are important during construction and after it,because of their potential hazards and failure for downstream population. The dam foundation seepage control the the importance from the perspective of a major engineering project and explain the economic performance of each project is allocated. among activities that can be used to prevent piping phenomena a...

Journal: :iranian journal of radiation research 0
m.n. salihin yusoff school of health science, university sains malaysia, kelantan, malaysia a. zakaria department of nuclear medicine, radiotherapy and oncology, hospital universiti sains malaysia, kelantan, malaysia

background: we investigated whether the lungheart ratio parameter (lhr) can be used to identify the optimum cut off frequency for butterworth filter in 99mtc myocardial spect imaging. materials and methods: this study involved a cardiac phantom system consisting of cardiac insert in which 1.10 cm cold defect was inserted into its myocardium wall and filled with 4.0 μci/ml (0.148 mbq/ml) 99mtc c...

A. A. Mirghasemi F. Eslamian M Heidarzadeh Seyed. Majdedin Mir Mohammad Hosseini

A sodium silicate-based chemical grout was used in the Karkheh dam site in order to examine the performance of the chemical grouting technique for stabilization of the dam's filter material. Karkheh, an embankment dam with the reservoir capacity of about 7.4 billion cubic meter at the maximum water level, is the largest dam in Iran. The grouting works performed at the dam site, were part of the...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید