نتایج جستجو برای: Earliness

تعداد نتایج: 940  

Journal: :Computers & Industrial Engineering 2005
S. Thiagarajan Chandrasekharan Rajendran

In many manufacturing systems, jobs that are completed early are held as finished-goods inventory until their due-dates, and hence we incur earliness costs. Similarly, jobs that are completed after their due-dates incur penalty. The objective in such situations would, therefore, be to meet the due-dates of the respective jobs as closely as possible, and consequently minimize the sum of earlines...

2006
Yann Hendel Francis Sourd

We use the Akers-Friedman geometric approach to solve the two jobs job-shop problem when there is an earliness cost on the first operation and a tardiness cost on the last operation of each job. We then generalize the problem by imposing earliness and tardiness costs on each operation and finally, we solve it using a dynamic programming algorithm. KeywordsEarliness-tardiness scheduling, Polyn...

Journal: :Computers & Industrial Engineering 2006
Jorge M. S. Valente

In this paper, we present dominance conditions for the single machine weighted earliness scheduling problem with no idle time. We also propose an algorithm that can be used to improve upper bounds for the weighted earliness criterion and lower bounds for an earliness/tardiness problem. The computational tests show that the algorithm is superior to an initial heuristic schedule and an existing a...

2012
Milad Yousefi Rosnah Mohd Yusuff

Scheduling problems involving both earliness and tardiness costs became more important in recent years. This kind of problems include both earliness and tardiness penalties and tries to reduce them. In this study a case study from real world is investigated. Since the machine is bottle neck in the production line and all jobs have a common restrictive due date and different earliness and tardin...

2014
Hamed Fazlollahtabar Mohammad Saidi-Mehrabad

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...

Journal: :Proceedings of the National Academy of Sciences of the United States of America 1999
N L Bradley A C Leopold J Ross W Huffaker

A phenological study of springtime events was made over a 61-year period at one site in southern Wisconsin. The records over this long period show that several phenological events have been increasing in earliness; we discuss evidence indicating that these changes reflect climate change. The mean of regressions for the 55 phenophases studied was -0.12 day per year, an overall increase in phenol...

Journal: :Annals OR 2001
Mario Vanhoucke Erik Demeulemeester Willy Herroelen

In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardiness penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness-tard...

2002
Bahrom Sanugi Abedlaziz Hamad Shaharuddin Salleh

We consider the problem of scheduling of n jobs to minimize the total earliness and tardiness penalty. The scheduling objective is to minimize the sum of job dependent earliness and tardiness penalties.. After determining the scheduling for single machine common due date, using neural network, the result shows that the neural network solution performs very well.

2014
Hamed Fazlollahtabar Mohammad Saidi-Mehrabad

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...

Journal: :Genetics and molecular research : GMR 2015
N M Vale L D Barili M H Souza L M M Moura J E S Carneiro P C Carneiro F L Silva

The objective of this study was to select genitors based on F1 and F2 generations, evaluated in different environments, to obtain segregating populations for the identification of strains showing improved earliness, yield, and carioca-type grains. Nine bean strains were crossed in a partial diallel scheme (4 x 5), in which group 1 included 4 strains with early cycles and group 2 included 5 elit...