One of the main concerns of the mining industry is to determine ultimate pit limits. Final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. The size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...

Journal: :int. journal of mining & geo-engineering 2013
ali asghar khodayari

one of the main concerns of the mining industry is to determine ultimate pit limits. final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. the size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...

Journal: :journal of mining and environment 2012
ebrahim elahi reza kakaie amir yusefi

ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. a number of algorithms such as floating or moving cone method, floating cone method ii and the corrected forms of this method, the korobov algorithm and the corrected form of this method, dynamic programming and the lerchs and grossmann algorithm based on grap...

Ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. A number of algorithms such as floating or moving cone method, floating cone method II and the corrected forms of this method, the Korobov algorithm and the corrected form of this method, dynamic programming and the Lerchs and Grossmann algorithm based on grap...

The Sungun copper deposit is located in about 40km north west of Ahar city in the east Azarbaigan province of Iran. The total geological ore deposit is estimated to be 740 million tons. In this study using all information from exploration and geotechnical studies of the area, final pit limits of Sungun copper deposit is designed by the 2-D Lerchs & Grossmann Algorithm. By this method, from 740 ...

The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considere...

Sungun Copper Mine is located in an area with a high level of seismic hazard. Most recently, the Ahar-Varzeqan earthquake with a magnitude of 6.2 on Richter scale occurred on August 11, 2012; at a distance about 40 kilometers away from the mine. Nevertheless, the seismic stability of the final pit wall has not been comprehensively reviewed. In this research, the southwestern wall of the final p...

A. Jafarnejad A. Khodayari,

In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

A.D. Akbari, M. Osanloo , M.A. Shirazi ,

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...