نتایج جستجو برای: Time constraint

تعداد نتایج: 1948885  

Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the m...

Journal: :مطالعات مدیریت صنعتی 0
محمد رحیم رمضانیان عضو هیات علمی دانشگاه گیلان محمد حسن قلی زاده عضو هیات علمی دانشگاه گیلان شیوا شبان

in this paper, based on the background of cost-oriented assembly line balancing problems, a novel mathematical model for scheduling and balancing the assembly line is offered that with the combination of task sequence-dependent setup time, parallel stations and resource constraint, minimizes the operational and investment costs of assembly system. due to the complexity of the problem, the equat...

Journal: :مهندسی صنایع 0
محمّد رضائی ملک دانشجوی دکتری مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران رضا توکلی مقدم استاد دانشکدة مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران فرشید عوض آبادیان کارشناس ارشد مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران

this paper presents a new bi-objective mathematical model for a permutation flowshop scheduling problem with availability constraint in case of preventive maintenance operations on machines. in this paper, preventive maintenance is flexible and there is not a certain time for the maintenance operation; however, time between two consecutive maintenance operations for each machine should not be g...

1995
Roberto J. Bayardo Daniel P. Miranker

A common technique for bounding the runtime required to solve a constraint satisfaction problem is to exploit the structure of the problem's constraint graph [Dechter, 92]. We show that a simple structure-based technique with a minimal space requirement, pseudo-tree search [Freuder & Quinn, 85], is capable of bounding runtime almost as effectively as the best exponential space-consuming schemes...

Journal: :Aerospace 2022

A fixed-time nonlinear circular guidance law that satisfies the impact time constraint is proposed. By utilizing geometric principle length of a arc connecting missile and target can be analytically calculated, exact expression time-to-go obtained. Thus, error shaped to zero, intercept at desired time, which crucial in salvo attack. The settling proved bounded by fixed does not depend on initia...

Journal: :journal of quality engineering and production optimization 2015
sahar tadayoni rad saiedeh gholami rasoul shafaei hany seidgar

this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

Journal: :International Journal of Environmental Science and Technology 2018

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید