نتایج جستجو برای: bi objective warehouse problem

تعداد نتایج: 1425513  

Journal: :International Journal of Grid and Distributed Computing 2016

2007
Wen-Syan Li Dengfeng Gao Rafae Bhatti Inderpal Narang Hirofumi Matsuzawa Masayuki Numao Masahiro Ohkawa Takeshi Fukuda

Data Warehouses and Business Intelligence (BI) applications are the top two priorities for CIO/CTOs (Celent report on December 14, 2005). A data warehouse IT infrastructure needs to support the requirement of (day time) ad hoc query response time and (night time) batch workload completion time. The following tasks need to be finished in a batch window: (1) Apply one day’s delta data to the base...

Journal: :international journal of industrial engineering and productional research- 0
هادی مختاری hadi mokhtari kashanدانشگاه کاشان اشکان مزدگیر ashkan mozdgir k.n. toosiدانشگاه خواجه نصیر الدین طوسی

assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. in many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. when some changes related to market demand occur, it is wo...

Journal: :مهندسی صنایع 0
محمّد رضائی ملک دانشجوی دکتری مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران رضا توکلی مقدم استاد دانشکدة مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران فرشید عوض آبادیان کارشناس ارشد مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران

this paper presents a new bi-objective mathematical model for a permutation flowshop scheduling problem with availability constraint in case of preventive maintenance operations on machines. in this paper, preventive maintenance is flexible and there is not a certain time for the maintenance operation; however, time between two consecutive maintenance operations for each machine should not be g...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید