نتایج جستجو برای: earliness and tardiness penalties

تعداد نتایج: 16827720  

2005
Han Hoogeveen

In this paper we give a survey of the most important results on multicriteria scheduling that have appeared in the literature or are to appear. We provide an extensive introduction including two example problems and then discuss the relevant literature. Here we pay special attention to the area of earliness-tardiness scheduling, scheduling with controllable processing times, simultaneous approx...

Journal: :Rairo-operations Research 2021

In this study, we consider single-machine scheduling problems with past-sequence-dependent (denoted by psd) setup times in which the of jobs are proportional to length already processed jobs. Under common (CON) and slack (SLK) due-date assignment methods, prove that weighted sum earliness, tardiness minimization remains polynomially solvable. We also give some extensions for psd times.

Journal: :Computers & OR 2008
Chung-Lun Li Gur Mosheiov Uri Yovel

We consider a single-machine scheduling problem with equal-sized jobs. The objective is to minimize the maximum weighted earliness-tardiness and due-date costs. We present an algorithm to solve this problem. Our algorithm makes use of bottleneck jobs and priority queues, and has a computational complexity of O(n logn). This complexity is a significant improvement of the existing algorithm in th...

Journal: :Inf. Process. Lett. 1996
Bahram Alidaee Ahmad Ahmadian

Alidaee and Ahmadian considered a single machine scheduling problem with varying processing times, and presented a polynomial algorithm that minimizes the sum of absolute deviations of jobs’ completion times from a common due date. In this short note we remark that it is possible to eliminate one of the algorithm steps, therefore obtaining a more efficient procedure. We also show that the appro...

2015
Richard J. Linn Benjamin Yen

Traditional machining economics looks into the optimal set of machining conditions under which the production cost or time per part is minimized. No due dates are included in the consideration. Job sequencing searches for the optimal order of jobs so that lateness and/or earliness is minimized. The optimization assumes that processing times are fixed. In practice, processing times are variable ...

2014
M. Berke Pamay Kerem Bülbül Gündüz Ulusoy

In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while keeping the costs related to changes in the sc...

Journal: :Perform. Eval. 2017
Eliran Sherzer Yoav Kerner

We consider a queueing facility where customers decide when to arrive. All customers have the same desired arrival time (w.l.o.g. time zero). There is one server, and the service times are independent and exponentially distributed. The total number of customers that demand service is random, and follows the Poisson distribution. Each customer wishes to minimize the sum of three costs: earliness...

2006
You In Choung

This paper considers a scheduling problem for a single burn-in oven in the semiconductor manufacturing industry where the oven is a batch processing machine with restricted capacity. The batch processing time is set by the longest processing time among those of all the jobs contained in the batch. All jobs are assumed to have the same due date. The objective is to minimize the sum of the absolu...

1995
F. S.

we consider a functional equation that arises in problems of scheduling with priorities and earliness/lateness penalties. We solve the equation and note how it can be used to analyze the invariance of conclusions about optimality of a schedule if the scale used to measure priority is replaced by another acceptable scale. Keywords-Scheduling, Functional equations, Measurement theory, Penalty fun...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید