نتایج جستجو برای: generation expansion planning
تعداد نتایج: 679837 فیلتر نتایج به سال:
This paper presents a multistage adaptive robust generation expansion planning model, which accounts for short-term unit commitment and ramping constraints, considers multi-period multi-regional planning, maintains the integer representation of units. The uncertainty electricity demand renewable power is taken into account through bounded intervals, with parameters that permit control over leve...
Electric Power Generation Expansion Planning (GEP) is the problem of determining an optimal construction and generation plan of both new and existing electric power plants to meet future electricity demand. We consider a stochastic optimization approach for this capacity expansion problem under demand and fuel price uncertainty. In a two-stage stochastic optimization model for GEP, the capacity...
This paper presents a development of an improved genetic algorithm (IGA) and its application to a least-cost generation expansion planning (GEP) problem. Least-cost GEP problem is concerned with a highly constrained nonlinear dynamic optimization problem that can only be fully solved by complete enumeration, a process which is computationally impossible in a real-world GEP problem. In this pape...
Abstract—During the recent past, due to the increase of electrical energy demand and governmental resources constraints in creating additional capacity in the generation, transmission, and distribution, privatization, and restructuring in electrical industry have been considered. So, in most of the countries, different parts of electrical industry like generation, transmission, and distribution...
We present a stochastic model for capacity-expansion planning of electricity distribution networks subject to uncertain demand (CEP). We formulate CEP as a multistage stochastic mixed-integer program with a scenario-tree representation of uncertainty. At each node of the scenario-tree, the model determines capacity-expansions, operating con guration, and power ows. A super-arc representation ...
In generation expansion planning, reliability level is the key criterion to ensure enough above peak demand in case there are any outages. This must be appropriately optimized provide a reliable system with minimum cost. Currently, method determine an optimal mainly focused on reserve margin, accustomed used by several utilities. However, Loss of Load Expectation (LOLE) more suitable for high p...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید