Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

2017
Kirandeep Kaur

The various meta-heuristic techniques for cloud and grid environment are: Ant Colony Optimization (ACO), Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Tabu Search, Firefly Algorithm, BAT Algorithm and many more. So this paper represents the two types of meta-heuristic techniques, i.e. BAT algorithm and Genetic Algorithm. The different types of methods which comprise meta-heuristic ...

1998
Vadim G. Timkovsky VADIM G. TIMKOVSKY

This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...

2010
Débora P. Ronconi Ernesto G. Birgin

Scheduling problems involving both earliness and tardiness costs have received significant attention in recent years. This type of problem became important with the advent of the justin-time (JIT) concept, where early or tardy deliveries are highly discouraged. In this work we examine the flowshop scheduling problem with no storage constraints and with blocking inprocess. In this latter environ...

Journal: :Applied Mathematics and Computation 2008
Jindae Kim Changsoo Ok

Distributed arrival time control (DATC) is a highly distributed feedback control algorithm for the scheduling problems in heterarchical operation systems [V.V. Prabhu, Performance of real-time distributed arrival time control in heterarchical manufacturing systems, IIE Transactions 32 (2000) 323–331]. Although DATC has presented outstanding performance for the real-time scheduling problems in d...

2007
Leticia C. Cagnina Susana C. Esquivel Carlos A. Coello Coello

Although Particle Swarm Optimizers (PSO) have been successfully used in a wide variety of continuous optimization problems, their use has not been as widespread in discrete optimization problems, particularly when adopting non-binary encodings. In this chapter, we discuss three PSO variants (which are applied on a specific scheduling problem: the Single Machine Total Weighted Tardiness): a Hybr...

Journal: :European Journal of Operational Research 2009
Christos Koulamas

Lawler [E.L. Lawler, A fully polynomial approximation scheme for the total tardiness problem, Operations Research Letters 1 (1982) 207–208] proposed a fully polynomial approximation scheme for the single-machine total tardiness problem which runs in O n 7 e time (where n is the number of jobs and e is the desired level of approximation). A faster fully polynomial approximation scheme running in...

1999
Andreas Bauer Bernd Bullnheimer Richard F. Hartl Christine Strauss

Ant Colony Optimization is a relatively new meta-heuristic that has proven its quality and versatility on various combinatorial optimization problems such as the traveling salesman problem, the vehicle routing problem and the job shop scheduling problem. The paper introduces an Ant Colony Optimization approach to solve the problem of determining a job-sequence that minimizes the overall tardine...

Journal: :J. Scheduling 2015
Kenneth R. Baker Dan Trietsch

We consider a scheduling problem in which the criterion for assigning due dates is to make them as tight as possible, while the criterion for sequencing jobs is to minimize their tardiness. Because these two criteria conflict, we examine the trade-off between the tightness of the due dates and the tardiness of the jobs. We formulate a version of this trade-off in the case of a stochastic single...