Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
ghasem moslehi professor of industrial engineering – isfahan university of technology kamran kianfar phd student of industrial engineering – isfahan university of technology

nowadays, scheduling problems have a considerable application in production and service systems. in this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. in many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combinat...

2016
M. K. Marichelvam K. Manivannan M. Geetha

In this paper, single machine scheduling problems with sequence dependent setup times are considered. The objective is to minimize the total weighted tardiness. The single machine total weighted tardiness (SMTWT) scheduling problems with sequence dependent setup times were proved to be strongly NP-hard. A recently developed meta-heuristic algorithm called as crow search algorithm is proposed to...

Journal: :Mathematical and Computer Modelling 2006
Gur Mosheiov Daniel Oron

In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...

Journal: :Computers & Industrial Engineering 2015
Hui Zhu Min Li Zhangjin Zhou

In this paper we investigate scheduling problems with a deteriorating and resource-dependent maintenance activity on a single machine. The duration of the maintenance is assumed to be dependent both on its starting time and on the resource allocated to it. The objective is determining the job sequence, the position to perform a maintenance activity and the amount of additional resource allocate...

2006
REZA TAVAKKOLI-MOGHADDAM BABAK JAVADI

This paper presents the fuzzy mixed-integer goal programming model for a single machine scheduling problem with bi-objectives consisting of the minimization of the total weighted flow time and total weighted tardiness. This model is solved by a fuzzy goal programming approach to verify and validate the proposed approach for the above problem. Two test problems in small and large sizes are gener...

2008
H. Allaoui

This paper focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance in a single machine subject to breakdowns. The objective is to minimize expected total earliness and tardiness costs with a common due-date. The problem of scheduling only n jobs to minimize total earliness and tardiness costs in a single machin...

Journal: :J. Intelligent Manufacturing 2015
Ali Allahverdi Harun Aydilek

The two-stage assembly flowshop scheduling problem is addressed with the objective of minimizing total tardiness. An insertion algorithm, a genetic algorithm, and a hybrid of the insertion and genetic algorithms, are developed for the problem. Conducted computational experiments reveal that the hybrid algorithm significantly outperforms the genetic algorithm while the best performing algorithm ...

2016
Mohsen Ziaee Hossein Karimi

In this paper, the non-permutation flow shop scheduling problem with preemption-dependent processing times is considered. A mixed integer programming formulation is proposed to tackle the problem. The optimization objective considered is the minimization of the total tardiness. The model is tested against random instances. The results allow us to identify the effect of some parameters such as c...

2006
Jan Kelbel Zdeněk Hanzálek

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

2011
Farhad Ghassemi-Tari Laya Olfat

This paper considers the problem of scheduling n jobs in the generalized tardiness flow shop problem with m machines. Seven algorithms are developed for finding a schedule with minimum total tardiness of jobs in the generalized flow shop problem. Two simple rules, the shortest processing time (SPT), and the earliest due date (EDD) sequencing rules, are modified and employed as the core of seque...