A Q-learning-based memetic algorithm for multi-objective dynamic software project scheduling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Q-learning-based memetic algorithm for multi-objective dynamic software project scheduling

Software project scheduling is the problem of allocating employees to tasks in a software project. Due to the large scale of current software projects, many studies have investigated the use of optimization algorithms to find good software project schedules. However, despite the importance of human factors to the success of software projects, existing work has considered only a limited number o...

متن کامل

A multi-objective memetic algorithm for risk minimizing vehicle routing problem and scheduling problem

In this paper, a new approach to risk minimizing vehicle routing and scheduling problem is presented. Forwarding agents or companies have two main concerns for the collection of high-risk commodities like cash or valuable commodities between the central depot and the customers: one; because of the high value of the commodities transported, the risk of ambush and robbery are very high. Two; the ...

متن کامل

A memetic algorithm for multi-objective dynamic location problems

This paper describes a new multiobjective interactive memetic algorithm applied to dynamic location problems. The memetic algorithm integrates genetic procedures and local search. It is able to solve capacitated and uncapacitated multi-objective single or multi-level dynamic location problems. These problems are characterized by explicitly considering the possibility of a facility being open, c...

متن کامل

A Novel Adapted Multi-objective Meta-heuristic Algorithm for a Flexible Bi-objective Scheduling Problem Based on Physics Theory

  We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...

متن کامل

A Multi-objective Genetic Algorithm for the Software Project Scheduling Problem

The software project scheduling problem considers the assignment of employees to project tasks with the aim of minimizing the project cost and delivering the project on time. Recent research takes into account that each employee is proficient in some development tasks only, which requiere specific skills. However, this cannot be totally applied in the Mexican context due to software companies d...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Information Sciences

سال: 2018

ISSN: 0020-0255

DOI: 10.1016/j.ins.2017.10.041