A WBS-Based Plan Changeability Measurement Model for Reducing Software Project Change Risk
نویسندگان
چکیده
منابع مشابه
An Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملChangeability Evaluation Model for Object Oriented Software
Changeability has a direct relation to software maintainability and has a major role in providing high quality maintainable and trustworthy software. The concept of Changeability is a major factor when we design and develop software and its constituents. Developing programs and its constituent components with good changeability continually improves and simplifies test operations and maintenance...
متن کاملdeveloping a risk management model for project based organizations
uncertainties in industrial environments can cause considerable complexities, during the implementation and management of projects. so, performing a risk management model in such environments has become inevitable. in such circumstances, many risk management models have been introduced in literature, which majorities of them are general, while some of them are developed to be applied to specifi...
متن کاملan integrated risk-based technique for project plan selection
selecting an effective project plan is a significant area in the project management. the present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. the efficient frontier includes two criteria: the project cost and the project time. besides, the paper presents a scheme to incorporate directed acyc...
متن کاملDeveloping a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Lecture Notes on Software Engineering
سال: 2014
ISSN: 2301-3559
DOI: 10.7763/lnse.2014.v2.102