An Integrated Efficiency–Risk Approach in Sustainable Project Control

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Efficiency–Risk Approach in Sustainable Project Control

The lack of integrated project control techniques covering both qualitative and quantitative indices is one of the most important reasons leading to unfinished projects under predetermined schedules and expected budgets. Two modern techniques proposed in project control—the critical chain method and buffer management (CCM/BM), and the earned value analysis or earned value management and earned ...

متن کامل

An integrated Decision-Making Approach for Road Transport Evaluation in a Sustainable Supply Chain

One important step to achieve a sustainable transportation system is to control the impact and evaluate the effect of various influencing factors toward three dimensions of sustainability. Within this context, diverse analytical approaches have been developed to assess the sustainability level of various transportation systems, however, sustainability evaluation based on fuzzy multiple criteria...

متن کامل

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

SMP: An Integrated Approach to Project Management

SMP is a project management tool specifically designed for process oriented software projects. It integrates six project management functions: process modeling, effort estimation, planning, tracking, control and measurement. Their integration is based on three basic principles : i) a project plan should follow from a process model; ii) effort estimation should be based on project historical dat...

متن کامل

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2017

ISSN: 2071-1050

DOI: 10.3390/su9091575