Analysis and Evaluation of Project Cost Risk Based on BP Algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study on Project Bidding Risk Evaluation Based on BP Neural Network Theory

By analyzing appraisable factors of engineering project bidding risk, a comprehensive evaluation model of engineering project bidding risk based on BP (back propagation) neural network is established to enhance the validity of evaluation in this paper. By learning of some effective samples given, the extraction and storage of experts’ knowledge and experience are realized with this model. Two s...

متن کامل

fabrication of new ion sensitive field effect transistors (isfet) based on modification of junction-fet for analysis of hydronium, potassium and hydrazinium ions

a novel and ultra low cost isfet electrode and measurement system was designed for isfet application and detection of hydronium, hydrazinium and potassium ions. also, a measuring setup containing appropriate circuits, suitable analyzer (advantech board), de noise reduction elements, cooling system and pc was used for controlling the isfet electrode and various characteristic measurements. the t...

An Improved BP Neural Network Algorithm Based on Factor Analysis

Back-Propagation (BP) neural network, as one of the most mature and most widespread algorithms, has the ability of large scale computing and has unique advantages when dealing with nonlinear high dimensional data. But when we manipulate high dimensional data with BP neural network, many feature variables provide enough information, but too many network inputs go against designing of the hidden-...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Systems Engineering Procedia

سال: 2011

ISSN: 2211-3819

DOI: 10.1016/j.sepro.2011.08.041