Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method
نویسندگان
چکیده
منابع مشابه
SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire ...
متن کاملAnalysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks
Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...
متن کاملThe Empirical Analysis of Money Laundering Trend in Iran (by Using PLS-SEM Method )
Money Laundering (ML) reduces the confidence of investors to the financial market, worsen political instability and deviates resources allocation to unproductive sectors by weakening of financial institutions credit. In the ML, illegal resources are entered into the legal economy secretly and outside formal control whereby it has hidden nature. The aim of this paper is to study the different si...
متن کاملanalysis of ruin probability for insurance companies using markov chain
در این پایان نامه نشان داده ایم که چگونه می توان مدل ریسک بیمه ای اسپیرر اندرسون را به کمک زنجیره های مارکوف تعریف کرد. سپس به کمک روش های آنالیز ماتریسی احتمال برشکستگی ، میزان مازاد در هنگام برشکستگی و میزان کسری بودجه در زمان وقوع برشکستگی را محاسبه کرده ایم. هدف ما در این پایان نامه بسیار محاسباتی و کاربردی تر از روش های است که در گذشته برای محاسبه این احتمال ارائه شده است. در ابتدا ما نشا...
15 صفحه اولUsing Structural Equation Modelling to Assess Effects of Construction Resource Related Factors on Cost Overrun
Cost performance is the basic criteria for measuring success of any project. Since construction projects are highly dependable on resources, construction cost is significantly affected by various resource related factors. Compared to traditional methods of data analysis, Structural Equation Model (SEM) is the graphical equivalent of a mathematical representation to study relationship between de...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Modern Applied Science
سال: 2013
ISSN: 1913-1852,1913-1844
DOI: 10.5539/mas.v7n8p78