Analysis of the dominant factors causing cost overrun in building construction projects

نویسندگان

چکیده

In building construction projects there are 3 factors that used to measure project performance, one of which is cost. Efforts can be made minimize the cost overrun knowing causative and how mitigate them. The purpose this study identify factors, determine dominant causing overrun, efforts methodology in research desk or uses relevant secondary data analysis, such as previous with similar problems. results were 65 divided into 10 groups. factor overruns includes material, implementation employment relationships, documents, finance groups, them fluctuations material prices. Mitigation have been obtained for factor, namely quality control field must good, selection professional workforce, good relations between parties.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

reliabilty assessment of conceptual cost estimates for building construction projects

in the early stages of a construction project, the reliability and accuracy of conceptual cost estimates are major concerns for clients and cost engineers. previous studies applied scoring methods and established common rules or mathematical methods to assess the quality of cost estimates. however, those approaches have some limitations in adapting to real-world projects or require understandin...

متن کامل

Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. Accor...

متن کامل

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia

Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP conference series

سال: 2021

ISSN: ['1757-899X', '1757-8981']

DOI: https://doi.org/10.1088/1755-1315/794/1/012008