BIM-based ventilation shaft construction schedule simulation and plan optimization

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

BIM-based Integrated Framework for Detailed Cost Estimation and Schedule Planning of Construction Projects

With the increasing popularity of Building Information Modeling (BIM), several research studies have focused on its application in the construction industry, and advancements such as developments of BIM-based tools for construction scheduling and cost estimating have been carried out. Nevertheless, these tools are each developed only for one particular aspect of construction management, such as...

متن کامل

Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation

This paper presents a novel methodology which assists in automating the generation of time schedules for bridge construction projects. The method is based on a simulation of construction works, taking into account the available resources and the interdependencies between individual tasks. The simulation is realized by means of a discrete-event simulation software originally created for plant la...

متن کامل

Object-oriented modeling of construction operations for schedule-cost integrated planning, based on BIM

The study is aimed to develop a method to integrate time and schedule data of construction projects using object-oriented modeling. Although, many researchers have recognized the importance of data integration and have suggested methods to associate timeand cost-related data, the information models and methodologies developed to integrate time and cost information are not being utilized widely ...

متن کامل

Simulation Based Multiobjective Schedule Optimization in Semiconductor Manufacturing

In semiconductor manufacturing, it requires more than one objective such as cycle time, machine utilization and due date accuracy to be kept in focus simultaneously, while developing an effective scheduling. In this paper, a near optimal solution, which is not inferior to any other feasible solutions in terms of all objectives, is generated with a combination of the analytically optimal and sim...

متن کامل

Runway Schedule Determination by Simulation Optimization

Many airport runway expansion projects are restricted by space limitations imposed by development in the vicinity of the airport. This often causes planners to choose configurations for new runways that limit the use of these runways in time and/or space. Studies that model airports with new runways that are not yet operational need to develop plausible operational models for these new runways ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Earth and Environmental Science

سال: 2021

ISSN: 1755-1315

DOI: 10.1088/1755-1315/634/1/012102