C-BORD project: “Effective container inspection at BORDer control points”
نویسندگان
چکیده
منابع مشابه
Workload Representation in the Modeling of Border Inspection Points
This paper presents the modeling of a border inspection system with open workloads and compares the results with a model using closed workloads. This approach allows introducing the dynamics of arrivals and their influence on system performance.
متن کاملGroup Identification at Border Crossing Points
Increasing Passenger flow at Border Crossing Points is an important kuuwg cv vqfc{Óu dqtfgt etquukpi rqkpvu *DERu+ qh ncpf. ugc cpf cktrqtv0 Itqwr Access Control and utilizing biometrics information will help increase passenger throughput and reduce human error in handling passengers erroneously. Using multi modal information for (biometric) group id can provide more robust handling of passenge...
متن کاملCargo Container X-ray Inspection Systems
OVERVIEW: Container inspection is categorized into three stages. In the initial stage, large-size X-ray DR (digital radiography) is used to inspect full containers sitting on their trailers. If that inspection identifies suspicious cargo, the trailer and container are relocated to a nearby inspection position for opening the container and inspecting all cargo inside. In the second stage, small-...
متن کاملStop Nuclear Smuggling Through Efficient Container Inspection
Since 2003, the U.S. government has spent $850 million on the Megaport Initiative which aims at stopping the nuclear smuggling in international container shipping through advanced inspection facilities including Non-Intrusive Inspection (NII) and Mobile Radiation Detection and Identification System (MRDIS). Unfortunately, it remains a significant challenge to efficiently inspect more than 11.7 ...
متن کاملOptimal timing of project control points
The project control cycle consists of measuring the status of the project, comparing to the plan, analysis of the deviations, and implementing any appropriate corrective actions. We present an analytical framework for determining the optimal timing of project control points throughout the life cycle of the project. Our approach is based on maximizing the amount of information generated by the c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EPJ Web of Conferences
سال: 2017
ISSN: 2100-014X
DOI: 10.1051/epjconf/201714609027