C-BORD project: “Effective container inspection at BORDer control points”

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Workload Representation in the Modeling of Border Inspection Points

This paper presents the modeling of a border inspection system with open workloads and compares the results with a model using closed workloads. This approach allows introducing the dynamics of arrivals and their influence on system performance.

متن کامل

Group Identification at Border Crossing Points

Increasing Passenger flow at Border Crossing Points is an important kuuwg cv vqfc{Óu dqtfgt etquukpi rqkpvu *DERu+ qh ncpf. ugc cpf cktrqtv0 Itqwr Access Control and utilizing biometrics information will help increase passenger throughput and reduce human error in handling passengers erroneously. Using multi modal information for (biometric) group id can provide more robust handling of passenge...

متن کامل

Cargo Container X-ray Inspection Systems

OVERVIEW: Container inspection is categorized into three stages. In the initial stage, large-size X-ray DR (digital radiography) is used to inspect full containers sitting on their trailers. If that inspection identifies suspicious cargo, the trailer and container are relocated to a nearby inspection position for opening the container and inspecting all cargo inside. In the second stage, small-...

متن کامل

Stop Nuclear Smuggling Through Efficient Container Inspection

Since 2003, the U.S. government has spent $850 million on the Megaport Initiative which aims at stopping the nuclear smuggling in international container shipping through advanced inspection facilities including Non-Intrusive Inspection (NII) and Mobile Radiation Detection and Identification System (MRDIS). Unfortunately, it remains a significant challenge to efficiently inspect more than 11.7 ...

متن کامل

Optimal timing of project control points

The project control cycle consists of measuring the status of the project, comparing to the plan, analysis of the deviations, and implementing any appropriate corrective actions. We present an analytical framework for determining the optimal timing of project control points throughout the life cycle of the project. Our approach is based on maximizing the amount of information generated by the c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: EPJ Web of Conferences

سال: 2017

ISSN: 2100-014X

DOI: 10.1051/epjconf/201714609027