Communication Program Planning
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
Surveillance-Based Program Planning
Introduction The IBBS is part of the Indonesian MoH HIV Surveillance System, which include Serological Surveillance, Behavioral Surveillance, Reproductive Tract Infection Survey, and monthly HIV/AIDS facilitybased (hospitals, HCs, VCT Sites) monthly reports. The IBBS 2011 was conducted in 11 provinces (22 districts/municipalities) encompassing eight Most At Risk Populations (MARPs) – injection ...
متن کاملPlanning for Communication Resources
For many human team activities, ranging from military operations through to emergency rescue or large entertainment events, communications resources must be assigned to different teams or team members. These assignments must reflect the capabilities of the available communication devices and avoid conflicting use of communications channels already in use in the local environment. In general, fi...
متن کاملAdvanced Program-to-Program Communication in SNA
Systems Network Architecture (SNA) defines the behavior of networks of heterogeneous, loosely coupled processors. This paper describes the development of program-to-program communication services in SNA and introduces Advanced Program-to-Program Communication (APPC), the culmination of this development. It also discusses the use of APPC in the construction of distributed services and shows that...
متن کاملPlanning Cordless Business Communication Systems
A new tool optimizes the placement of base stations for local wireless communications at company sites. It uses the latest in constraint-based programming technology.
متن کاملProgram and Evaluation Planning Light: Planning in the Real World
Although there are many high-quality models for program and evaluation planning, these models are often too intensive to be used in situations when time and resources are scarce. Additionally, there is little added value in using an elaborate and expensive program and evaluation planning procedure when programs are small or are planned to be short-lived. To meet the need for simplified models f...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Communications
سال: 1971
ISSN: 1051-0834
DOI: 10.4148/1051-0834.2077