Construction Project Planning and Scheduling: A Case of Inlet Separator Fabrication

نویسندگان

چکیده

Project construction activities must be analyzed from the planning stage to execution so that they can achieved optimally and achieve best performance point. relies on a project scheduling system, of course requiring updates modifications show conditions in real time. The aims this paper is propose system accommodate projects have large-scale by proposing risk analysis using Primavera P6 analysis. A case study was conducted an inlet separator fabrication Batam, Indonesia. proposed method calculate optimal completion time through automatic with primavera software. demonstrates practical value for managers identifying shortest duration estimating most carrying out activities. In addition, provide more complex information including successors predecessors activities, critical times, estimates overall project.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

discursive motivation/demotivation construction: a case of iranian efl majors

بررسی نقش گفتمان در شکل گیری یا کاهش انگیزش فراگیران زبان خارجی موضوع تحقیق نسبتاً جدیدی است. از این رو، تحقیقات کمی در این زمینه وجود دارد. به منظور پر کردن این خلاء ، مطالعه کنونی به بررسی فرآیند گفتمان مدار شکل گیری یا کاهش انگیزش دانشجویان ایرانی زبان انگلیسی پرداخت. نخست، این مطالعه به صورت آزمایشی با 7 نفر (? دانشجوی پسر و 5 دختر) از دانشجویان سال دوم دوره ی کارشناسی زبان و ادبیات انگلیسی ...

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

a comparison of linguistic and pragmatic knowledge: a case of iranian learners of english

در این تحقیق دانش زبانشناسی و کاربردشناسی زبان آموزان ایرانی در سطح بالای متوسط مقایسه شد. 50 دانش آموز با سابقه آموزشی مشابه از شش آموزشگاه زبان مختلف در دو آزمون دانش زبانشناسی و آزمون دانش گفتار شناسی زبان انگلیسی شرکت کردند که سوالات هر دو تست توسط محقق تهیه شده بود. همچنین در این تحقیق کارایی کتابهای آموزشی زبان در فراهم آوردن درون داد کافی برای زبان آموزان ایرانی به عنوان هدف جانبی تحقیق ...

15 صفحه اول

Optimal Construction Project Planning

The nature of the construction industry combined with the lack of appropriate techniques and technologies suitable for construction work are among the main reasons for inadequate industry performance. Researchers need to develop a better understanding of the construction industry and develop approaches and technologies that will enable construction companies to do a better job in estimating, pl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of economics, finance and management studies

سال: 2021

ISSN: ['2644-0490', '2644-0504']

DOI: https://doi.org/10.47191/jefms/v4-i11-14