Data-driven machine criticality assessment – maintenance decision support for increased productivity
نویسندگان
چکیده
منابع مشابه
Multi-Objective Markov Decision Processes for Data-Driven Decision Support
We present new methodology based on Multi-Objective Markov Decision Processes for developing sequential decision support systems from data. Our approach uses sequential decision-making data to provide support that is useful to many different decision-makers, each with different, potentially time-varying preference. To accomplish this, we develop an extension of fitted-Q iteration for multiple o...
متن کاملFrom Data to Optimal Decision Making: A Data-Driven, Probabilistic Machine Learning Approach to Decision Support for Patients With Sepsis
BACKGROUND A tantalizing question in medical informatics is how to construct knowledge from heterogeneous datasets, and as an extension, inform clinical decisions. The emergence of large-scale data integration in electronic health records (EHR) presents tremendous opportunities. However, our ability to efficiently extract informed decision support is limited due to the complexity of the clinica...
متن کاملData visualization for truth maintenance in clinical decision support systems
Please cite this article in press as: L national Journal of Pediatrics and Ad http://dx.doi.org/10.1016/j.ijpam.2
متن کاملDecision-driven Maintenance
ion. In Cobol, on the other hand, a selection must be made from Paragraph, Section and External Module because they are valid alternatives for implementing a functional component. The subset Inp represents input links between source software objects and decisions: Inp = { (s,d) | s ∈S ∧ d ∈D ∧ "s is input to d" } The subset Out represents output links between decisions and target software objec...
متن کاملA Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)
Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Production Planning & Control
سال: 2020
ISSN: 0953-7287,1366-5871
DOI: 10.1080/09537287.2020.1817601