Delay Analysis for Current Mode Threshold Logic Gate Designs

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

MOS Current Mode Logic Near Threshold Circuits

Near threshold circuits (NTC) are an attractive and promising technology that provides significant power savings with some delay penalty. The combination of NTC technology with MOS current mode logic (MCML) is examined in this work. By combining MCML with NTC, the constant power consumption of MCML is reduced to leakage power levels that can be tolerated in certain modern applications. Addition...

متن کامل

A Capacitive Threshold-Logic Gate

A dense and fast threshold-logic gate with a very high fan-in capacity is described. The gate performs sum-ofproduct and thresholding operations in an architecture comprising a poly-to-poly capacitor array and an inverter chain. The Boolean function performed by the gate is soft programmable. This is accomplished by adjusting the threshold with a dc voltage. Essentially, the operation is dynami...

متن کامل

Efficient minimization Techniques for Threshold Logic Gate

optimization techniques are discussed using digital logic network using threshold logic. Almost same energy consumption changing speedup is possible using threshold network and many complex functions can be implemented using threshold logic with lesser number of logic gate and logic level for which these optimization techniques becomes popular for digital system design and applications. In this...

متن کامل

Low Delay-Power Product Current-Mode Multiple Valued Logic for Delay-Insensitive Data Transfer Mechanism

Conventional delay-insensitive (DI) data encodings require 2N+1 wires for transferring N-bit. To reduce complexity and power dissipation of wires in designing a large scaled chip, a DI data transfer mechanism based on current-mode multiple valued logic (CMMVL), where N-bit data transfer can be performed with only N+1 wires, is proposed. The effectiveness of the proposed data transfer mechanism ...

متن کامل

A Fault Tolerant Threshold Logic Gate Design

Threshold Logic gate is used as design abstraction for most nano devices and perceived as an alternate emerging technology to CMOS implementation. It is vulnerable to manufacturing inaccuracies that alter weight values which inadvertently affect the functionality of the gate. Hence fault tolerance should be taken in to consideration during the design of threshold logic gates to tolerate manufac...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Very Large Scale Integration (VLSI) Systems

سال: 2017

ISSN: 1063-8210,1557-9999

DOI: 10.1109/tvlsi.2016.2608953