Delay Analysis in Full-Duplex Heterogeneous Cellular Networks

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of Statistical QoS in Half Duplex and Full Duplex Dense Heterogeneous Cellular Networks

Statistical QoS provisioning as an important performance metric in analyzing next generation mobile cellular network, aka 5G, is investigated. In this context, by quantifying the performance in terms of the effective capacity, we introduce a lower bound for the system performance that facilitates an efficient analysis. Based on the proposed lower bound, which is mainly built on a per resource b...

متن کامل

Full-Duplex Cellular Networks: It Works!

Full-duplex (FD) communications with bidirectional transmitting and receiving at the same time and frequency radio resource have long been deemed a promising way to boost spectrum efficiency, but hindered by the techniques for self-interference cancellation (SIC). Recent breakthroughs in analog and digital signal processing yield the feasibility of beyond 100 dB SIC capability and make it possi...

متن کامل

Resource Allocation in Full Duplex Heterogeneous Networks with eICIC

— In this paper, we consider a two-tier heterogeneous Orthogonal Frequency Division Multiple Access (OFDMA) network which consists of one Full Duplex (FD) macrocell and several FD femtocells. Enhanced Inter-Cell Interference Coordination (eICIC) by means of Almost Blank Subframe (ABS) is considered to reduce the cross-tier interference. We formulate a resource allocation problem to maximize th...

متن کامل

Hybrid Scheduling in Heterogeneous Half- and Full-Duplex Wireless Networks

Full-duplex (FD) wireless is an attractive communication paradigm with high potential for improving network capacity and reducing delay in wireless networks. Despite significant progress on the physical layer development, the challenges associated with developing medium access control (MAC) protocols for heterogeneous networks composed of both legacy half-duplex (HD) and emerging FD devices hav...

متن کامل

On Cell Association in Multi-Tier Full-Duplex Cellular Networks

This paper addresses the cell association problem in multi-tier in-band full-duplex (FD) networks. Specifically, we consider the case of decoupled cell association (DCA) in which users are not necessarily served by the same base station (BS) for uplink and downlink transmissions. Instead, users can simultaneously associate to different BSs based on two independent weighted path-loss cell associ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Vehicular Technology

سال: 2019

ISSN: 0018-9545,1939-9359

DOI: 10.1109/tvt.2019.2932191