Determination of an Optimal Production Run Length in a Deteriorating Production Process with Rework

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal production run length and inspection schedules in a deteriorating production process

This paper presents an economic manufacturing quantity model which determines an optimal production run length and inspection schedules simultaneously in a deteriorating production process. It is assumed that a production process is subject to a random deterioration from the in-control state to the out-of-control state and, thus, produces some proportion of defective items. An optimal productio...

متن کامل

Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this stud...

متن کامل

An economic production model for deteriorating items and time dependent demand with rework and multiple production setups

Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have focused on developing rework model, but few of them have developed model for deteriorating items. Due to t...

متن کامل

Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...

متن کامل

Optimal production run length for products sold with warranty

The paper studies the optimal production run length for a deteriorating production system. The optimal warranty cost is determined by a balance between the warranty cost of the manufacturer and the buyer during its warranty period. It is assumed that the elapsed time until the production process shift is age dependent and arbitrarily distributed. The objective is to minimize the total cost per ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Korean Institute of Industrial Engineers

سال: 2014

ISSN: 1225-0988

DOI: 10.7232/jkiie.2014.40.2.233