Earning And Obtaining Reinforcers Under Concurrent Interval Scheduling
نویسندگان
چکیده
منابع مشابه
Key-peck probability and topography in a concurrent variable-interval variable-interval schedule with food and water reinforcers.
The relation between variables that modulate the probability and the topography of key pecks was examined using a concurrent variable-interval variable-interval schedule with food and water reinforcers. Measures of response probability (response rates, time allocation) and topography (peck duration, gape amplitude) were obtained in 5 water- and food-deprived pigeons. Key color signaled reinforc...
متن کاملConcurrent Locomotive Assignment and Freight Train Scheduling
The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotiv...
متن کاملReal-Time Scheduling Under Time-Interval Constraints
This paper presents a new task model where jobs are divided into segments A, B and C. Segment B has a specific time-interval where it should execute to fulfill some application constraints. We consider the execution of B as valid if performed inside that time-interval, otherwise, its contribution may be valueless to its task. We adapt some scheduling approaches from the literature and present a...
متن کاملAssessing reinforcers under progressive schedule requirements.
Recent research findings suggest that reinforcing stimuli may be differentially effective as response requirements increase. We extended this line of research by evaluating responding under increasing schedule requirements via progressive-ratio schedules and behavioral economic analyses. The differential effectiveness of preferred stimuli in treating destructive behavior maintained by automatic...
متن کاملStatistical estimation algorithms for repairs-time limit replacement scheduling under earning rate criteria
K e y w o r d s M a i n t e n a n c e , Repair-time limit, Imperfect repair, Earning rate, Lorenz statistics, Nonparametric. This research was partially supported by the Ministry Education, Culture, Sports, Science and Technology, Grantin-Aid for Exploratory Research; Grant No. 15651076 (2003-2005), Scientific Research (B); Grant No~ 16310116 (2004-2006), Scientific Research (C); Grant No. 1651...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Experimental Analysis of Behavior
سال: 2005
ISSN: 0022-5002
DOI: 10.1901/jeab.2005.76-04