Energy- and labor-aware flexible job shop scheduling under dynamic electricity pricing: A many-objective optimization investigation
نویسندگان
چکیده
منابع مشابه
Flexible job shop scheduling under availability constraints
In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...
متن کاملMulti-Objective Flexible Job Shop Scheduling Optimization Models (II)
For the Multi-Objective Flexible Job Shop Scheduling Problems (MOFJSSP), various optimization models have been designed. In the first part of the research (published in no. 2/2012) we presented the multi-sort production systems, the theoretical aspects of MOFJSSP framework, a specific real JSS process in drugs industry based on over 600 tasks to be optimally scheduled (used as a case study for ...
متن کاملMulti-Objective Flexible Job Shop Scheduling Optimization Models (I)
In manufacturing area, the most difficult problems related to the time-efficiency frequently occur if the jobs to be scheduled are heterogeneous, if there are alternative routes on the machines for the jobs and multiple objectives are imposed. This framework, named Multi-Objective Flexible Job Shop Scheduling Problems (MOFJSSP), has been formalized, modeled and studied in the last decades from ...
متن کاملSolving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملflexible job shop scheduling under availability constraints
in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Cleaner Production
سال: 2019
ISSN: 0959-6526
DOI: 10.1016/j.jclepro.2018.10.289