Fiscal Implications of Immigration-A Net Present Value Calculation

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

Net Present Value with Uncertainty

Projects may be evaluated and compared according to the Net Present Value (NPV) of their cash flow. The NPV is the discounted expected revenues minus the costs over the lifetime of the project. Traditional NPV calculations do not take into account the uncertainty in the variables that influence the revenues and costs. We present a simulation approach to incorporate uncertainty in the NPV calcul...

متن کامل

Fuzzy Interval Net Present Value

In this paper we conjugate the operative usability of the net present value with the capability of the fuzzy and the interval approaches to manage uncertainty. Our fuzzy interval net present value can be interpreted, besides the usual present value of an investment project, as the present value of a contract in which the buyer lets the counterpart the possibility to release goods/services for m...

متن کامل

Net Present Value Simulating with a Spreadsheet

Decision making has always been a difficult process, based on various combinations if objectivity (when scientific tools were used) and subjectivity (considering that decisions are finally made by people, with their strengths and weaknesses). The IT revolution has also reached the areas of management and decision making, helping managers make better and more informed decisions by providing them...

متن کامل

A Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value

This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).&#10In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Scandinavian Journal of Economics

سال: 2003

ISSN: 0347-0520,1467-9442

DOI: 10.1111/1467-9442.t01-2-00009