Floor Vibration Serviceability in a Multistory Factory Building

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Study of Dynamic Characteristics of a Multistory Building Using Ambient Vibration Tests (TECHNICAL NOTE)

Dynamic characteristics of a typical multistory building in Iran have been studied in two different stages of building construction, using ambient vibration tests. Finite element models have also been used to determine these characteristics and to verify test results. The results indicated the agreements and also differences between conventional theoretical models and the behaviour of real stru...

متن کامل

Multistory Floor Plan Generation and Room Labeling of Building Interiors from Laser Range Data

Automatic generation of building floor plans is useful in many emerging applications, including indoor navigation, augmented and virtual reality, as well as building energy simulation software. These applications require watertight models with limited complexity. In this paper, we present an approach that produces 2.5D extruded watertight models of building interiors from either 2D particle fil...

متن کامل

Floor System Vibration Control

Experience in the design of steel and concrete floor systems to control vibrations suggests that a floor system’s vibration characteristics are often fundamental to its acceptable performance. In such cases, serviceability drives the design instead of strength. This is particularly true for laboratory floors that support sensitive equipment and floor girders that fall within certain spans. This...

متن کامل

Vibration properties of a timber floor assessed in laboratory and during building construction

In the present work the change in natural frequencies, damping and mode shapes of a prefabricated timber floor element have been investigated when it was integrated into a building structure. The timber floor element was first subjected to modal testing in laboratory with ungrounded and simply supported boundary conditions, and then in situ at different stages of building construction. The firs...

متن کامل

Optimisation of factory floor layout in a complex manufacturing process

This contribution describes the methods used in a factory floor optimization process. The manufacturing process involves approximately 140 machines and is concentrated around a group of multipurpose CNC machines. We have analysed the current state of the manufacturing system by constructing a discrete event simulation (DES) model. The factory manufactures approximately 30,000 different products...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Performance of Constructed Facilities

سال: 2016

ISSN: 0887-3828,1943-5509

DOI: 10.1061/(asce)cf.1943-5509.0000688