Flow shop rescheduling under different types of disruption

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flowshop rescheduling under di erent types of disruptions

Almost all manufacturing facilities need to use production planning and scheduling systems to increase productivity and to reduce production costs. Real-life production operations are subject to a large number of unexpected disruptions that may invalidate the original schedules. In these cases, rescheduling is essential for minimizing the impact in the performance of the system. In this work we...

متن کامل

Partial Order Backtracking Based Job Shop Rescheduling

We present here a discipline for job shop rescheduling based on partial order backtracking. We show that partial order backtracking ooers the rescheduler a framework for schedule repair, based upon a set of nogoods, which impose a systematic partial order on the set of activities to be repaired but allows non systematic techniques to be used within that framework. We present rescheduling as par...

متن کامل

Investigating a Hybrid Metaheuristic for Job Shop Rescheduling

Previous research has shown that artificial immune systems can be used to produce robust schedules in a manufacturing environment. The main goal is to develop building blocks (antibodies) of partial schedules that can be used to construct backup solutions (antigens) when disturbances occur during production. The building blocks are created based upon underpinning ideas from artificial immune sy...

متن کامل

Disruption Management with Rescheduling of Trips and Vehicle Circulations

This paper introduces a combined approach for the recovery of a timetable by rescheduling trips and vehicle circulations for a rail-based transportation system subject to disruptions. We propose a novel event-based integer programming (IP) model. Features include shifting and canceling of trips as well as modifying the vehicle schedules by changing or truncating the circulations. The objective ...

متن کامل

Nurse rescheduling with shift preferences and minimal disruption

Hospital wards must be staffed 24 hours a day by a limited number of nurses. With a well documented shortage of nurses in many countries, effective rostering of nurse shifts is crucial. Recent research on nurse rostering has focused on creating flexible rosters that are attractive to nurses, with the joint aims of improving the quality of care and increasing staff retention. To achieve this, so...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2013

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207543.2012.666856