Full Load Distribution Scheduling Problem for Refined Oil

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective mathematical model for production-distribution scheduling problem

With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...

متن کامل

Estimating Maximum Resource Load for Resource-Constrained Project Scheduling Problem

This paper focuses on estimating maximum resource loads in ResourceConstrained Project Scheduling Problem (RCPSP). We examine a variant of vector sum problem with fractions: considering preemptions allowed, determine what part of each of n jobs should be accomplished in order to minimize sum of squares of non-consumed amounts of resources, taking into account the resource constraints along with...

متن کامل

Load Balancing for Adaptively Refined Grids

The solution of partial differential equations on a parallel computer is usually done by a data parallel approach. The grid is partitioned and mapped onto the processors. However, partitioning of unstructured meshes and adaptively refined meshes in general is an NP -hard problem and heuristics are needed. In this paper a parallelisable and cheap method based on space-filling curves is analysed....

متن کامل

Effect of Crude Soybean Oil Sediment as a Substitute for Refined Soybean Oil in Broiler Diet

Four hundred fifty day old unsexed broiler chicks were used in a 35-day trial at Chittagong veterinary and animal sciences university farm to find out the effect of using crude soybean oil sediment (CSOS) as a substitute for refined soybean oil (RSO) in broiler diet. The experiment was carried out following completely randomized design. The chicks were randomly distributed in three treatment gr...

متن کامل

A Heuristic for the Integrated Production and Distribution Scheduling Problem

The integrated problem of production and distribution scheduling is relevant in many industrial applications. Thus, many heuristics to solve this integrated problem have been developed in the last decade. Most of these heuristics use a sequential working principal or a single decomposition and integration approach to separate and solve subproblems. A heuristic using a multi step decomposition a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Science Journal of Applied Mathematics and Statistics

سال: 2016

ISSN: 2376-9491

DOI: 10.11648/j.sjams.20160405.11