Graph-Based Automated Construction Scheduling without the Use of BIM
نویسندگان
چکیده
The construction industry has been suffering from delays and cost overruns for decades. Experienced schedulers programs allocate contingencies (both time) based on professional experiences gained knowledge. Such tacit knowledge not captured, stored, shared with inexperienced schedulers. This paper proposes a graph-based automated scheduling (GAS) method to capture, store, reuse the in schedules. proposed GAS takes schedules as input, extracts schedule features, classifies into different types of sequences, selects assembles sequences schedules, eventually optimizes time- cost-efficiency assembled was validated two case studies. results indicated that automatically generated is, average, 6.70% closer actual than planned schedule. Different existing automatic methods, relies little availability data richness building information modeling (BIM) models. Hence, helps initiate new more efficiently at early stages.
منابع مشابه
a gender-based pragmatic analysis of the use of english compliment responses by iraqi efl students:a speech act perspective
تعارفات کنش های گفتاری هستند که افراد در زندگی روزمر? خود به منظور برقراری دوستی یا تداوم روابط مسالمت آمیز به کار می برند. ساز و کار تعارف مختص زبان انگلیسی یا هر زبان دیگری نیست و پدیده ای است جهانی و در همه زبانها حضور دارد. تفاوتی که از این نظر در زبانها و فرهنگ ها وجود دارد مربوط به پاسخ به این کنش گفتاری در گفتمان است. این مطالعه به بررسی تنوع پاسخ های انگلیسی و عربی به کنش گفتاری تعارف د...
the use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach
abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...
15 صفحه اولA Concept for Automated Construction Progress Monitoring Using Bim-based Geometric Constraints and Photogrammetric Point Clouds
On-site progress monitoring is essential for keeping track of the ongoing work on construction sites. Currently, this task is a manual, time-consuming activity. The research presented here, describes a concept for an automated comparison of the actual state of construction with the planned state for the early detection of deviations in the construction process. The actual state of the construct...
متن کاملA BIM-based automated site layout planning framework for congested construction sites
a r t i c l e i n f o Keywords: Actual travel paths Building information modelling (BIM) Construction site layout planning (CSLP) Congested sites Facility dimensions optimization Interior storage Site layout planning is often performed on construction sites to find the best arrangement of temporary facilities so that transportation distances of on-site personnel and equipment are minimized. It ...
متن کاملDegree-based graph construction
Degree-based graph construction is an ubiquitous problem in network modeling [1, 2], ranging from social sciences to chemical compounds and biochemical reaction networks in the cell. This problem includes existence, enumeration, exhaustive construction and sampling questions with aspects that are still open today. Here we give necessary and sufficient conditions for a sequence of nonnegative in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Construction Division and Management
سال: 2023
ISSN: ['1943-7862', '0733-9364']
DOI: https://doi.org/10.1061/jcemd4.coeng-12687