Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers

0360-8352/$ see front matter 2008 Elsevier Ltd. A doi:10.1016/j.cie.2008.09.004 q This manuscript was processed by Area Editor Ma * Corresponding author. Tel./fax: +52 653 5356168 E-mail address: [email protected] (V. Yaurima This paper presents a genetic algorithm for an important production scheduling problem. Since the problem is NP-hard, we focus on suboptimal scheduling solutions for the ...

متن کامل

Hybrid Flowshop with Unrelated Machines, Sequence Dependent Setup Time and Availability Constraints: An Enhanced Crossover Operator for a Genetic Algorithm

This paper presents a genetic algorithm for a scheduling problem frequent in printed circuit board manufacturing: a hybrid flowshop with unrelated machines, sequence dependent setup time and machine availability constraints. The proposed genetic algorithm is a modified version of previously proposed genetic algorithms for the same problem. Experimental results show the advantages of using new c...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

scheduling of unrelated parallel machines using two multi objective genetic algorithms with sequence-dependent setup times and precedent constraints

abstract: this paper considers the problem of scheduling n jobs on m unrelated parallel machines with sequence-dependent setup times. to better comply with industrial situations, jobs have varying due dates and ready times and there are some precedence relations between them. furthermore sequence-dependent setup times and anticipatory setups are included in the proposed model. the objective is ...

متن کامل

Multi-objective Unrelated Parallel Machines Scheduling with Sequence-dependent Setup times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Industrial Engineering

سال: 2009

ISSN: 0360-8352

DOI: 10.1016/j.cie.2008.09.004