Improved Visual Hook Capturing and Tracking for Precision Hoisting of Tower Crane

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of a Tower Crane Accident

Today, steel tower cranes are widely used in the construction sites. In this study, the accident occurred in Turkey in 2006 with the overturning of a tower crane in a construction site and the damage occurred on the nearby buildings due to this accident were taken into consideration. At first, the technical characteristics of the EC-H type tower crane used in that construction and then the reas...

متن کامل

3D Tower Crane as a mechatronic tool for education

The paper presents a laboratory model of the 3D tower crane. The arm of the crane is approx 1.2m long and the model is approx. 1.5m heigh. The crane is equipped with three DC motors that control: the rotary movement of the tower, the movement of the trolley and up and down movement of the load. The model is equipped with an unique unit for measuring an angle position of the load. The paper cont...

متن کامل

A BIM-based approach for automated tower crane layout planning

a Australasia Joint Research Centre for Building Information Modelling, Curtin University, Australia b School of Management Science and Engineering, Anhui University of Finance & Economics, China c Department of Housing and Interior Design, Kyung Hee University, Seoul, South Korea d School of Construction Management and Real Estate, Chongqing University, China e School of Engineering and Techno...

متن کامل

Prediction Model for Hoisting Time Using Luffing-type Crane for High-rise Building Construction

Hoisting planning for systematic and efficient vertical transportation is one of the key factors for successful completion in high-rise building construction. However, despite this importance, minimal research has been carried out for predicting hoist time, which is a key player in hoisting planning. Therefore, this study proposed a prediction model for vertical hoisting time using a luffing-ty...

متن کامل

Identification and assessment of human errors among tower crane operators using SHERPA and CREAM techniques

Introduction: Cranes are of the major causes of accidents in the construction industries. As human error mostly causes crane accidents, this study aims to investigate the human errors of tower crane operators in the construction projects using SHERPA and CREAM techniques. Material and Method: In this research, first, all of the tasks of the tower crane operator were identified and analyzed. Th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Mechanical Engineering

سال: 2013

ISSN: 1687-8140,1687-8140

DOI: 10.1155/2013/426810