M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics
نویسندگان
چکیده
منابع مشابه
Expected Duration of Dynamic Markov Pert Networks
In this paper, we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in accordance wit...
متن کاملExpected Duration of Dynamic Markov PERT Networks
Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...
متن کاملProbabilistic estimation of software project duration
This paper presents a framework for the representation of uncertainty in the estimates for software design projects for use throughout the entire project lifecycle. The framework is flexible in order to accommodate uncertainty in the project and utilises Monte Carlo simulation to compute the propagation of uncertainty in effort estimates towards the total project uncertainty and therefore gives...
متن کاملAn Approximation for the Activity Duration Distribution, Supporting Original PERT
The Program Evaluation and Review Technique (PERT) has been widely used as a tool for project management. In PERT analysis the activity time distribution is assumed to be a beta distribution, and the mean and variance of the activity time are estimated. The activity mean and variance are very useful to find the expected project duration and variance of the critical path. By generalizing the ass...
متن کاملplanning and scheduling barley production mechanization project using the pert network: case study alborz province
agricultural mechanization project must be identified in a short time frame to do a certain way; otherwise, cost is not the time to come and will also result in reduced yield. to avoid these costs in farming systems is necessary in any region that agricultural mechanization projects are and scheduling and planning as well as scientific until activities included in the project to fruition are do...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Engineering and Management
سال: 2017
ISSN: 0733-9364,1943-7862
DOI: 10.1061/(asce)co.1943-7862.0001358