Maintenance Grouping Optimization for Offshore Wind Turbine Considering Opportunities Based on Rolling Horizon Approach

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

On maintenance optimization for offshore wind farms

On maintenance optimization for offshore wind farms FRANÇOIS BESNARD Abstract The maintenance cost is known to be an important part of the levelized cost of energy generated by wind parks. Operational costs can be significantly reduced by optimizing decisions for maintenance strategies, maintenance support organization and maintenance planning. This is especially important for offshore wind pow...

متن کامل

An Approach to Supporting Maintenance of Offshore Wind Turbine Blades

Offshore wind turbine blades suffer from various faults such as blade angle asymmetry, icing, and bends. Replacement of rotor blades normally involves heavy transportation (e.g., vessel and crane), and dependency on weather conditions. As a result, wind turbines come to a long standstill and costs on energy production increase. One approach to reducing the downtime and costs is to apply a prope...

متن کامل

An Optimal Number-Dependent Preventive Maintenance Strategy for Offshore Wind Turbine Blades Considering Logistics

In offshore wind turbines, the blades are among the most critical and expensive components that suffer from different types of damage due to the harsh maritime environment and high load. The blade damages can be categorized into two types: the minor damage, which only causes a loss in wind capture without resulting in any turbine stoppage, and the major (catastrophic) damage, which stops the wi...

متن کامل

Opportunistic Maintenance Optimization for Wind Turbine Systems Considering Imperfect Maintenance Actions

Currently corrective maintenance and time-based preventive maintenance strategies are widely used in wind power industry. However, few methods are applied to optimize these strategies. This paper aims to develop opportunistic maintenance approaches for an entire wind farm rather than individual components that most of the existing studies deal with. Furthermore, we consider imperfect actions in...

متن کامل

PHM-Based Wind Turbine Maintenance Optimization Using Real Options

A simulation-based real options analysis (ROA) approach is used to determine the optimum predictive maintenance opportunity for a wind turbine with a remaining useful life (RUL) prediction. When an RUL is predicted for a subsystem in a single turbine using PHM, a predictive maintenance option is triggered that the decision-maker has the flexibility to decide if and when to exercise before the s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Polish Maritime Research

سال: 2018

ISSN: 2083-7429

DOI: 10.2478/pomr-2018-0063