Note—On “Further Results on Planning Horizons in the Production Smoothing Problem”
نویسندگان
چکیده
منابع مشابه
Planning horizons for the deterministic capacity problem
.\bstract-\Ve consider the problem of determinmg the optim,A timing and king ui ns\+ i’aciilt! conctruction under a continuous technology model of possible sizes. The rate of conLergen<r of ihurt tu lung run optimal policies is established 2nd plannin g horizon implication\ are explored. KC aI\u pr<,cn: Jn rtficient algorithm for solving such problems fur all horizon times by solbing a jingle h...
متن کاملFurther Results on Betweenness Centrality of Graphs
Betweenness centrality is a distance-based invariant of graphs. In this paper, we use lexicographic product to compute betweenness centrality of some important classes of graphs. Finally, we pose some open problems related to this topic.
متن کاملConsidering Production Planning in the Multi-period Inventory Routing Problem with Transshipment between Retailers
Generally, the inventory routing problem occurs in a supply chain where customers consider the supplier responsible for inventory replenishment. In this situation, the supplier finds the answer to questions regarding the time and quantity of delivery to the customer as well as the sequence of customers in the routes. Considering the effect of production decisions on answering these questions, t...
متن کاملFurther results on total mean cordial labeling of graphs
A graph G = (V,E) with p vertices and q edges is said to be a total mean cordial graph if there exists a function f : V (G) → {0, 1, 2} such that f(xy) = [(f(x)+f(y))/2] where x, y ∈ V (G), xy ∈ E(G), and the total number of 0, 1 and 2 are balanced. That is |evf (i) − evf (j)| ≤ 1, i, j ∈ {0, 1, 2} where evf (x) denotes the total number of vertices and edges labeled with x (x = 0, 1, 2). In thi...
متن کاملForecast Horizons for Production Planning with Stochastic Demand
Forecast horizons, i.e long enough planning horizons that ensure agreement of first period optimal production decisions of finite and infinite horizon problems regardless of changes in future demand, are shown to exist in the context of production planning under stochastic demand. The monotonicity of first period optimal production decisions with respect to first order stochastic shifts in dema...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Management Science
سال: 1978
ISSN: 0025-1909,1526-5501
DOI: 10.1287/mnsc.24.16.1774