Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Constrained Non-Renewable Resource Allocation in Metagraphs with Discrete Random ‎Times

In this paper, it is supposed that a project can be shown as a metagraph. The duration of activities are discrete random variables with known probability function, also one kind of consumable and constrained resource is required to execute each activity of the project.The objective of this paper is to maximize the probability of completion of stochastic metagraph before the due date of the proj...

متن کامل

Multi-mode renewable resource-constrained allocation in PERT networks

This paper presents a hybrid metaheuristic algorithm (HMA) for Multi-Mode Resource-Constrained Project Scheduling Problem (MRCPSP) in PERT networks. A PERT-type project, where activities require resources of various types with random duration, is considered. Each activity can be accomplished in one of several execution modes and each execution mode represents an alternative combination of resou...

متن کامل

Bicriteria Resource Allocation Problem in Pert Networks

We develop a bicriteria model for the resource allocation problem in PERT networks, in which the total direct costs of the project as the first objective, and the mean of project completion time as the second objective are minimized. The activity durations are assumed to be independent random variables with either exponential or Erlang distributions, in which the mean of each activity duration ...

متن کامل

Constrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Scientia Iranica

سال: 2012

ISSN: 1026-3098

DOI: 10.1016/j.scient.2012.02.024