Optimal Scheduling of Hydraulically Coupled Power Plants with Runoff Prediction
نویسندگان
چکیده
منابع مشابه
Power Optimal Opportunistic Scheduling
In this paper, we propose a power optimal opportunistic scheduling scheme for a multiuser single hop Time Division Multiple Access (TDMA) system. We formulate the problem of minimizing average transmission power with different minimum rate constraints for individual users. We suggest a stochastic approximation based scheme to implement the policy and argue the convergence of this algorithm. Fin...
متن کاملTimely-Throughput Optimal Scheduling with Prediction
Motivated by the increasing importance of providing delay-guaranteed services in general computing and communication systems, and the recent wide adoption of learning and prediction in network control, in this work, we consider a general stochastic single-server multi-user system and investigate the fundamental benefit of predictive scheduling in improving timely-throughput, being the rate of p...
متن کاملOptimal Scheduling of Multistage Polymer Plants
This article introduces a new mixed integer linear programming model of the optimal scheduling of multistage polymer plants. Most commodity polymer plants for products such as HDPE, PP, LDPE, LLDPE, PVC, PS, K-RESIN and CB are composed of reaction, extrusion and packaging stages. The operation of the reaction stage has the characteristics of both a batch process in that one process produces mul...
متن کاملDynamic Load Scheduling Optimization of Power Plants
In this paper a Mixed Integer Dynamic Optimization (MIDO) framework is exploited for combined Unit Commitment and Economic Load Scheduling (UCELS) optimization of power plants. Economic load scheduling optimization problem is formulated as a Dynamic Optimization (DO) problem that allows us to optimize the plant operations by taking into account the time varying dynamics. Dynamic optimization pr...
متن کاملOptimal scheduling of continuous plants with energy constraints
Abstract This work addresses the scheduling of continuous single stage multiproduct plants with parallel units and shared storage tanks. Processing tasks are energy intensive and we consider timedependent electricity pricing and availability together with multiple intermediate due dates, handled as hard constraints. A new discrete-time aggregate formulation is proposed to rapidly plan the produ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEJ Transactions on Power and Energy
سال: 1991
ISSN: 0385-4213,1348-8147
DOI: 10.1541/ieejpes1990.111.2_164